Major Drilling Indonesia Achieves over 3 Million Hours LTI Free
![](https://www.majordrilling.com/wp-content/uploads/2020/06/DSC_0011_35-scaled-1-1024x576.jpeg)
Major Drilling – PT Pontil Indonesia teams have achieved over 3 million hours lost time injury free at four different project sites. The combined workforce of 600 operates at different locations throughout the region drilling both on the surface and…
Kevin GibsonJune 29, 2020